Facilities

Maria Gatton Phillips Elementary School Gymnasium Window Replacement Project

 

This project will require to remove and replace 27 existing windows in and around the gymnasium at Marie Gatton Phillips Elementary School.  It is the contractor’s responsibility to schedule a time with Ashley Troutman, facilities director, to review this project on site and obtain their own window measurements.  Windows to be replaced will be aluminum frames with 1’’ insulated clear tempered glass.  All windows replaced should have flashing and caulking to insure a tight seal and no leaks.  All existing widows being replaced will be the contractor’s responsibility to haul off.  The contractor selected for this project will be required to supply background checks off all employees that will be working on this property.   We expect this job to be completed by January 6, 2020.